| PM 1.5: Generation of Preliminary Plan |
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| External | - | All | Project Order | - | - |
/ISO IEC 12207/
Supply Proc.: Devlp. Proc.: Doc. Proc.: Mngmt. Proc.: Infraest. Proc.: Training Proc.: |
||
| PM1.4 | accepted | All | Project Manual | - | - | |||
| PM7 | being proc. | Existing | Project Plan | PM3 , PM4 , PM6 , PM7 , PM8 , PM10 , PM11 , PM12 , CM1 , CM4.7 , QA1 |
being proc. (1) |
BAR EMOD FMEA (2) NPT TREE |
SPM01 SPM04 SPM05 |
|
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
To do so the marginal conditions (from activity PM1.2 - Definition of Project Criteria and Development Strategy ) and the project-specific V-Model (relevant activities and products) must be taken into consideration.
The planning must be set up in several steps:
Since special requirements are expected of the development process and the development environment from a certain criticality level, it might be necessary that tools having the required functionality or quality are available as soon as possible.
The staff must be experienced enough to generate an analysis of the cooperation of the selected IT measures (security functions and security concepts). The same staff must also be able to realize efficiency analyses for the mechanisms and methods selected for the implementation of the security functions and security concepts.
In the case of higher criticality, the staff available must have sufficient experience with semiformal or formal specifications.
If an accompanying evaluation is to be realized, the cooperation of the evaluating staff member and the BSI must also be considered in the planning.
Detailed planning for the following planning section must be realized during the corresponding initialization.
For products within a baseline that are subject to dynamic processing (refinement or adding of statements) the planned processing status of the corresponding products must be established.
Recommendation
One of the important planning points is the coordination of SWMM measures, subcontractors and subprojects. However, the coordination is not limited to project or product-internal matters; it must also be generally applied since this is the only way to reuse (sub-) products and to make the most of the experience of individual staff members.
Explanation
Roles
| Role | Participation | ||
|---|---|---|---|
| Project Leader | responsible
| Project Administrator |
cooperating
| |
Methods
| Product | Methods Allocation | Use |
|---|---|---|
|
Chapter 2.1 Project Plan. Product Structure Plan |
TREE - Tree Diagram | Generate |
|
Chapter 2.2 Project Plan. Process Organization |
NPT - Network Planning Technique | Generate |
|
Chapter 3.1.1 Project Plan. Efforts (Planned and Actual) for SD/QA/CM/PM Activities |
EMOD - Estimation Models | Generate |
|
Chapter 3.1.2 Project Plan. Deadlines (Planned and Actual) for SD/QA/CM/PM Activities |
BAR - Bar Plan | Generate |
|
Chapter 3.1.3 Project Plan. Milestone Plan |
BAR - Bar Plan | Generate |
|
Chapter 3.1.6 Project Plan. Delivery and Supply Deadlines |
BAR - Bar Plan | Generate |
|
Chapter 4.1 Project Plan. Staff |
BAR - Bar Plan | Generate |
|
Chapter 4.2 Project Plan. Resources |
BAR - Bar Plan | Generate |
|
Chapter 5 Project Plan. Risk Considerations |
FMEA - Failure Mode Effect Analysis (2) | Generate |
Tools Requirements
External Norms
| Norm | Process | Chapter | Obs. |
|---|---|---|---|
| /ISO IEC 12207/ | Supply Process | Planning | (s. Part 3 - ISO 3.2.1) |
| Development Process | Process Implementation | (s. Part 3 - ISO 3.2.1) | |
| Documentation Process | Process Implementation | (s. Part 3 - ISO 3.2.2) | |
| Management Process | Planning | (s. Part 3 - ISO 3.2.3) | |
| Infraestructure Process | Process Implementation | (s. Part 3 - ISO 3.2.3) | |
| Training Process | Process Implementation | (s. Part 3 - ISO 3.2.3) |
Links to the V-Model Mailinglist
(2) Method FMEA is to be applied if
- high restrictive planned values (deadlines, costs) or
- high requirements
have to be fulfilled in the project.
![]() |
![]() |