PM8 - Projektkontrolle und -steuerung
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| PM1 | accepted | All | Project Manual | - | - |
/ISO IEC 12207/
Supply Proc.: Mngmt. Proc.: Infraest. Proc.: |
||
| PM1 or PM4 |
being proc. | Existing | Project Plan | - | - | |||
| PM12 | - | All | Work Order | - | - | |||
| SD, QA, CM |
accepted | All | SD, QA, CM Products | - | - | |||
| PM3, PM7 |
- | All | Report Documents: Protocol , Progress Report , Final Project Report , Case Report , Memo , Internal Message , Invitation |
PM3 , PM4 , PM7 |
- |
BA BAR (1) EVT (1) FMEA (2) NPT TRDA |
SPM04 SPM06 | |
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
These actual data must then be compared with the planned values from the Project Plan, and with the effort yet to be invested. In this connection, it is not enough just to find out the actual status of the operative SD activities; for example the efforts of the required QA measures must also be taken into consideration. If the planned specifications are surpassed or if it seems that they will be surpassed, corresponding steering measures must be initiated.
Roles
| Role | Participation | ||||
|---|---|---|---|---|---|
| Project Leader | responsible
| Project Administrator |
cooperating
| Controller |
cooperating
| |
Methods
| Product | Methods Allocation | Use |
|---|---|---|
|
Report Documents: Protocol , Progress Report , Final Project Report , Case Report , Memo , Internal Message , Invitation |
BA - Benefit Analysis | Generate |
| BAR - Bar Plan (1) | Generate | |
| EVT - Earned Value Method (1) | Generate | |
| FMEA - Failure Mode Effect Analysis (2) | Generate | |
| NPT - Network Planning Technique | Generate | |
| TRDA - Trend Analysis | Generate |
Tools Requirements
| Product | Functional Tools Requirements |
|---|---|
| Report Documents | SPM04 - Supporting Planning of the Project Realization |
| Report Documents | SPM06 - Supporting Project Control and Steering |
External Norms
| Norm | Process | Chapter | Obs. |
|---|---|---|---|
| /ISO IEC 12207/ | Supply Process | Execution and Control | (s. Part 3 - ISO 3.2.1) |
| Management Process | Execution and Control | (s. Part 3 - ISO 3.2.3) | |
| Infraestructure Process | Maintenance of the Infraestructure | (s. Part 3 - ISO 3.2.3) |
(2) Method FMEA is to be applied if
- high restrictive planned values (deadlines, costs) or
- high requirements
have to be fulfilled in the project.