![]() |
![]() |
![]() |
|
![]() |
|||
![]() |
|||
| FAO.3 Cross Referencing V-Model Products and Activities to FAO Requirements |
BRH.3 Zuordnung der V-Modell-Produkte und -Aktivitäten zu den BRH-Forderungen
| Chapter | Brief Description of Requirement | Met by | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.4.1 | planning and use IT | IT framework concept, V-Model products 1.4.2 |
IT documentation, complete and non-overlapping |
V-Model, in general
| 1.4.3 |
computer-aided documentation |
Submodel CM
| 1.4.4 |
availability of documentation |
project-specific organizational regulations, CM
| 1.4.5 |
design, generation and content of documentation as well as distribution and archivation |
V-Model, in general, | especially Project Manual, CM Plan 2 |
overall plan and coordination |
IT framework concept, contributions of V-Model to individual IT enterprises | 3.1.1 |
IT enterprise |
objective of the V-Model
| 3.1.2 |
uniform procedure to be defined in writing |
V-Model, in general, especially Project Manual | 3.2.1 |
responsibilities and procedures |
Project Manual, | Project Plan, CM Plan, QA Plan 3.2.2 |
overall IT plan |
phase model (outside V-Model)
| 3.3.1 |
preliminary and final investigation |
phase model (outside V-Model)
| 3.3.5 |
combination of preliminary and final investigation |
no requirement
| 3.3.6 |
documentation of results of preliminary and final investigation |
phase model (outside V-Model)
| 3.4.1.1 |
realization of an IT enterprise |
V-Model, in general
| 3.4.1.2 |
documentation of realization of an IT enterprise |
V-Model, in general
| 3.4.2 |
procurement of hardware and software |
PM2 - Placement/ Procurement, | scenario Application of Off-the-Shelf-Products 3.4.3 |
placing of development orders |
PM1.5 - Generation of Preliminary Plan, | PM4 - Detailed Planning, application as a basis for contracts (Coordinating the V-Model in its Environment manual) 3.4.4.1 |
regulations for generation of programs |
V-Model, in general, especially Project Manual | 3.4.4.2 |
structure of programs |
V-Model, in general
| 3.4.4.3 |
user-friendliness |
observance while processing submodel SD
| 3.4.4.4 |
process documentation |
V-Model products
| 3.4.5.1 |
test of IT procedures |
submodel QA
| 3.4.5.2 |
performing tests |
submodel QA
| 3.4.5.3 |
documentation of test results |
submodel QA
| 3.4.5.4 |
release (who is in charge) |
not regulated in V-Model
| 3.4.5.5 |
release certificate |
not regulated in V-Model
| 3.4.5.6 |
release (prerequisites) |
not regulated in V-Model, but mentioned in PM 6
| 3.4.5.7 |
release of externally developed procedures |
submodel QA
| 3.4.5.8 |
release to be defined in writing |
not regulated in V-Model
| 3.4.5.9 |
no modifications after release |
Submodel CM
| 3.4.6.1 |
no unauthorized modifications after integration into production environment |
Submodel CM
| 3.4.6.2 |
introducing an IT procedure |
SD9 - Transition to Utilization
| 3.4.6.3 |
consulting and training after introduction of procedure |
Operational Information
| 3.5.1 |
maintenance of procedures |
V-Model, in general
| 3.5.2 |
written rules for the fast elimination of errors |
CM Plan
| 3.5.3 |
documentation of changes |
CM3 - Change Management (Configuration Control)
| 4 |
operation of IT procedures |
not regulated in V-Model
| 5 |
success control |
not regulated in V-Model
| 6.1 |
control of procedure development |
QA3 - Process Assessment of Activites
| 6.2 |
checking correct application of procedures |
PM6 - Phase Review
| 7.2.1 |
threat and risk analysis |
SD1.6 - Threat and Risk Analysis, | SD2.1 - Technical System Design 7.2.2 |
technical and organizational measures |
SD1 - System Requirements Analysis, | SD2 - System Design, in addition to IT framework concept |
![]() |
![]() |
This page online GDPA Online Last Updated 03.Mar.2004 by C. Freericks |