| SD 9: Transition to Utilization |
SE9 - Überleitung in die Nutzung
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD8 | accepted | Existing | Operational Information: User Manual Diagnosis Manual Operator Manual Other Application Information |
SD9 | submitted |
/ISO IEC 12207/
Devlp. Proc.: |
||
| SD1 | accepted | All | SWMM Concept | - | - | |||
| SD8 | accepted | All |
System (installable) |
- | - | |||
| - | - | All |
System (installed and in operation) |
External (customer) | - | |||
+ "Kapitel" sind zusätzliche Spalten zum Originalausdruck AU 250
Handling
Figure 4.10: SD9 - Transition to Utilization
This activity comprises tasks that are required to install a completed System at the intended application site and to put it into operation. In case several application sites are planned, the activity must be planned accordingly and has to take place at these various sites. Prerequisite for the installation is the completion of all the required infrastructure provisions.
Roles
| Role | Participation | ||||||
|---|---|---|---|---|---|---|---|
| SD Supervisor | cooperating (SD9.2)
| System Administrator |
responsible (SD9.1,
SD9.2,
SD9.3)
| Technical Author |
cooperating (SD9.1)
| User |
cooperating (SD9.1,
SD9.3) |
|
Sub-activities
Tools Requirements
External Norms
Links to the V-Model Mailinglist
![]() |
![]() |