| SD 9.3: Putting into Operation |
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD8 | accepted | Existing | Operational Information: User Manual Diagnosis Manual Operator Manual Other Application Information |
- | - | |||
| SD9.2 | accepted | All |
System (installed) |
- | - | |||
| - | - | All |
System (in operation) |
External (customer) | - | |||
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
In order to support putting into operation, the following measures are required:
Explanation
In order to guarantee a smooth operation, the old job sequences/the old System might have to be operated in parallel to the new System.
To discard the old System correctly (e. g. canceling licenses, deleting data stocks, disposing/returning the old System, etc.) the legal regulations have to be adhered to.
Putting into operation is a prerequisite for acceptance.
Roles
| Role | Participation | ||
|---|---|---|---|
| User | cooperating
| System Administrator |
responsible
| |
Links to the V-Model Mailinglist
![]() |
![]() |
GDPA Online
Last Updated 01.Jan.2002
Updated by Webmaster
Last Revised 01.Jan.2002
Revised by Webmaster
![]() |