| SD 4-SW: Preliminary SW Design |
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD1 | accepted | All | User Requirements | - | - | |||
| SD2 | accepted | All | System Architecture | - | - | |||
| SD3 | accepted | All | Technical Requirements | - | - | |||
| SD2 | being proc. | Existing | Interface Description | SD5-SW CM4 |
submitted |
ACC (7) COM (2) DVER (6) FS (5) IAM (2) STMO (3) |
||
| SD2 | being proc. | Existing | Interface Overview | SD5-SW CM4 |
submitted |
COM (2) MODIAG (2) SSM (2) |
||
| SD2 | being proc. | Existing | Integration Plan | SD7-SW SD8 QA2 |
submitted | |||
| SD3 | being proc. | Existing | Operational Information: User Manual Diagnosis Manual Operator Manual Other Application Information |
SD5-SW | being proc. | |||
| - | - | All | Software Architecture | SD5-SW | submitted |
ACC (7) COM (2) DVER (6) FS (5) MODIAG (2) ODT (8) PIM (3) PRODIAG (2) SSM (2) STM (4) STRD (8) |
||
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
Figure 4.5: SD4 - Preliminary SW Design
This activity includes the design of the Software Architecture, inclusive of: the completion of the Interface Overview, the description of the SW interfaces, and the update of the Integration Plan on SW level.
It is task of the Software Architecture design to set up processes with regard to the dynamics of the SW Unit, and possibly to realize the allocation to processors; it is also to design communication and synchronization of the processes and to define SW Modules, SW Components and Databases from the point of view of the static structure of the SW Unit. A short performance specification has to be set up for each of these architecture elements, and the generated interfaces must be identified. The cooperation of SW Modules/Processes, SW Components and Databases must then be specified in the Interface Description. This information is used as a starting point for the detailed software design.
The Operational Information (User Manual, Diagnosis Manual, Operator Manual, Other Application Information) started on system level must now be completed by the information about the SW Unit in question.
Roles
| Role | Participation | ||
|---|---|---|---|
| SW Developer | responsible (SD4.1-SW,
SD4.2-SW,
SD4.3-SW)
| Technical Author |
cooperating (SD4.1-SW,
SD4.3-SW) |
|
Sub-activities
Tools Requirements
External Norms
Links to the V-Model Mailinglist
(2) The methods have to be applied in object-oriented developments.
(3) Method PIM is to be applied when the design contains several processes to be parallelly executed.
(4) Method STM is to be applied if complex situations have to be considered during the run of the function or the process.
(5) Method FS is to be applied in case of special requirements to correctness, e. g. based on very high criticality. According to [ITSEC], FS is required for the description of the formal security model with the evaluation level E4, for the preliminary design FS is required with the evaluation level E6.
(6) A formal specification on two different abstraction levels is required for the application of DVER. Because of the great effort, the most critical portions of a specification have to be selected for which the DVER has to be applied. According to [ITSEC], method DVER is required for the proof of the formal security model with the evaluation level E4, for the proof of consistency between security model and preliminary design DVER is required with the evaluation level E6.
(7) Method ACC must be applied according to [ITSEC].
(8) Method ODT is to be applied for a realtime-oriented development with parallel processes; otherwise method STRD has to be applied.