| SD 4.3-SW: Specification of SW Integration |
SD4.3-SW - SW-Integration spezifizieren
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD4.2-SW | accepted | All | Interface Description | - | - |
/ISO IEC 12207/
Devlp. Proc.: |
||
| SD4.1-SW | accepted | All | Software Architecture | - | - | |||
| SD4.1-SW | being proc. | Existing | Operational Information: User Manual Diagnosis Manual Operator Manual Other Application Information |
SD5-SW | being proc. | |||
| SD2 | being proc. | Existing | Integration Plan | SD7-SW SD8 QA2 |
submitted |
BAR (1) DTAB (2) NPT (1) |
SPM04 | |
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
The tasks in connection with the Integration Plan also yield further details for the Operational Information. The Information for the Operator Manual and the Information for the Diagnosis Manual have to be updated; in particular the information with regard to the availability of the facility and the environment components as well as the start and end of operation will be completed. In Other Application Information all those particularities must be documented that refer to installation and configuration. The present Interface Description yields clues for the refinement of the Information for the User Manual.
Roles
| Role | Participation | ||
|---|---|---|---|
| SW Developer | responsible
| Technical Author |
cooperating |
|
Methods
| Product | Methods Allocation | Use |
|---|---|---|
|
Chapter 4.1 Integration Plan. Integration Network Plan |
BAR - Bar Plan (1) | Generate |
| NPT - Network Planning Technique (1) | Generate | |
|
Chapter 5.2 Integration Plan. Integration Instructions |
DTAB - Decision Table Technique (2) | Generate |
Tools Requirements
| Product | Functional Tools Requirements |
|---|---|
| Integration Plan.Organization of the Integration | SPM04 - Supporting Planning of the Project Realization |
External Norms
| Norm | Process | Chapter | Obs. |
|---|---|---|---|
| /ISO IEC 12207/ | Development Process | Software Integration | (s. Part 3 - ISO 3.2.1) |
(2) Method DTAB is to be applied for the description of complex facts and circumstances.
![]() |
![]() |