| SD 5.2-SW: Analysis of Resources and Time Requirements |
SD5.2-SW - Betriebsmittel- und Zeitbedarf analysieren
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD1 | accepted | All | User Requirements | - | - | |||
| SD3 | accepted | All | Technical Requirements | - | - | |||
| SD4-SW | accepted | All | Software Architecture | - | - | |||
| SD4-SW | accepted | All | Interface Overview | - | - | |||
| SD4-SW | accepted | All | Interface Description | - | - | |||
| SD5.1-SW | accepted | All | Data-Dictionary | - | - | |||
| SD5.1-SW | being proc. | Existing | SW Design (Module) SW Design (Database) |
- | - | |||
| - | - | 3 | SW Design (Module). Characteristic Quantities, |
SD6-SW | submitted |
ACC (1) SIMU (2) |
SSD18 SSD19 SSD31 |
|
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
Roles
| Role | Participation |
|---|---|
| SW Developer | responsible |
Methods
| Product | Methods Allocation | Use |
|---|---|---|
|
Chapter 3 SW Design (Module). Characteristic Quantities |
ACC - Analysis of Covert Channels (1) | Generate |
| SIMU - Simulation Models (2) | Generate | |
|
Chapter 3 SW Design (Database). Characteristic Quantities |
ACC - Analysis of Covert Channels (1) | Generate |
| SIMU - Simulation Models (2) | Generate |
Tools Requirements
External Norms
(2) Method SIMU is to be applied if reliability requirements are high nd the use conditions are so complex that static investigations with regard to feasibility and resource requirements are not sufficient.