| PM 5: Cost/Benefit Analysis |
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| SD2 | being proc./ accepted |
All | System Architecture | - | - |
/ISO IEC 12207/
Mngmt. Proc.: |
||
| SD1 | accepted | All | SWMM Concept | - | - | |||
| - | - | All | Cost/Benefit Analysis | PM6 SD2 |
submitted | BA | ||
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
To do so the required cost for each of the (different) solution proposals will be estimated and compared with the expected benefits.
While estimating cost and benefits, the entire lifecycle of the possible solution(s) has to be taken into consideration (not only the development), in the course of which the various sections of the lifecycle (development, utilization, removal from service) must be estimated separately. While doing so, the uncertainties of the given estimates, which depend essentially on the degree of refinement of the present solution proposals, have to be pointed out. The SWMM Concept has to be taken into account for the estimation.
Recommendation
Roles
| Role | Participation | ||||
|---|---|---|---|---|---|
| Project Leader | responsible
| Project Administrator |
cooperating
| Controller |
cooperating
| |
Methods
| Product | Methods Allocation | Use |
|---|---|---|
| Cost/Benefit Analysis | BA - Benefit Analysis | Generate |
Tools Requirements
External Norms
| Norm | Process | Chapter | Obs. |
|---|---|---|---|
| /ISO IEC 12207/ | Management Process | Execution and Control | (s. Part 3 - ISO 3.2.3) |
![]() |
![]() |
GDPA Online
Last Updated 01.Jan.2002
Updated by Webmaster
Last Revised 01.Jan.2002
Revised by Webmaster
![]() |