| CM 3.1: Change Evaluation |
Contents
|
|
|
|---|
Product Flow
| From | Product | to | Methods | Tool Req. | Ext. Norms | |||
|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | |||
| CM1 | accepted | All | CM Plan | - | - | |||
| External (1) | - | All | Change Request/Problem Report | - | - | |||
| - | - | All | Change Proposal | CM3.2 | - | |||
| - | - | All | Protocol | CM4.5 External (1) |
- | |||
| - | - | All | Change Status List | CM3.2 CM3.3 CM4.5 |
- | |||
+ "Chapter" are extra columns from the original printed version of GD 250
Handling
The following roles participate in the evaluation of the change:
SD products
SD roles
PM products
PM roles
QA products
QA roles
CM products
CM roles
All those investigations which are realized within the scope of realizing the Change Proposal are outside submodel CM.
Recommendation
Explanation
Roles
| Role | Participation | ||||
|---|---|---|---|---|---|
| Project Leader | responsible
| CM Representative |
cooperating
| CM Administrator |
cooperating
| |
Tools Requirements
External Norms
![]() |
![]() |
GDPA Online
Last Updated 01.Jan.2002
Updated by Webmaster