ISO.2.3 AQAP-150 Conformity on the Basis of the V-Model |
|
ISO.2.3 AQAP-150-Konformität auf der Basis des V-Modells
The AQAP-150 completes the rules of the organization-related AQAP-110 in a project-related way with regard to use during software development. As ISO 9001, part 3, AQAP-150 also demands a process model for the software development. This requirement can be met when using the V-Model.
AQAP-150 additionally uses a comprehensive QA Plan (SPQP Plan) as a basis document of the quality management system (QA systems). The contents required for this plan are covered by the following V-Model documents (see table ISO.2):
AQAP-150 (Version March 1993) |
GD 250 (V-Model) |
| Chapter in QA Plan |
Chapter |
| QA Plan |
Project Manual |
Project Plan |
CM Plan |
Assessment Plan |
| 0 Cover Sheet |
|
|
|
|
|
| 1 Introduction |
|
|
|
|
|
| 1.1 Purpose |
1 |
|
|
|
|
| 1.2 Scope |
1 |
|
|
|
|
| 1.3 SMM Update |
- |
|
|
|
|
| 1.4 Related Documents |
1 |
|
|
|
|
| 1.5 Relation to other Documents |
1 |
|
|
|
|
| 2 Project Description |
|
|
|
|
|
| 2.1 Project Overview |
|
2 |
|
|
|
| 2.2 Assumptions |
1 |
2; 3 |
|
|
|
| 2.3 Products to be delivered |
|
3 |
|
|
|
| 3 Management |
|
|
|
|
|
| 3.1 SW Development Process |
|
4; 5 |
2; 4 |
|
|
| 3.2 Organization |
|
7 |
|
|
|
| 3.3 Correction Measures |
|
(5.4) |
|
3 |
|
| 3.4 Measures with Regard to Subcontracts |
|
|
|
total |
|
| 3.5 Configuration Management |
(5.6) |
4 |
|
2.2 |
|
| 3.6 Already developed SW |
(5.1) |
|
|
4 |
|
| 3.7 Storage of Information |
5.6 |
|
|
4 |
|
| 3.8 Handling and Storing Data Media |
|
|
|
|
|
| 4 Software Technique |
|
|
|
|
|
| 4.1 SW Development Environment |
|
6 |
|
|
|
| 4.2 Methods/Procedures/Standards |
|
6;8 |
|
|
|
| 4.3 Development Documentation |
|
5 |
|
|
|
| 5 Evaluation and Verification (E/V) |
3 |
5 |
|
|
total
|
All information in brackets is partially covered.
Table ISO.2: Similarities between V-Model and QA Plan of AQAP-150
In order to completely cover AQAP-150, the following requirements for a QA system going beyond the V-Model have to be met as well. The following list is to be used for a better understanding. Only the original text of the AQAP-150 is valid.
1. SW Quality Management System (QM System)
- 1.1 The contractor has to use a documented, effective, and high-performance QA system for the subject matter which is part of a comprehensive, integrated quality management system.
- 1.2 Periodical and systematic reviews by the contractor must be prepared; they are to guarantee the efficiency of the QM system.
- 1.3 Preparations have to be made to make sure that the QM system will be regularly and systematically reviewed.
The following requirements of the AQAP-150 have to be integrated as additional specifications into the Project Manual.
2. Quality of the Finished Products
It must be possible to prove the quality of SW products that will not be delivered.
3. Definition and review of the software requirements
The contractor must be informed as early as possible about possible uncertain factors in the interpretation and realization of software, performance and quality features demanded by the contract.
4. Investigation and review of software requirements.
- 4.1 The documentation about software requirements has to include a clear and precise description of the limitations for the design and be listed separately from the product features /characteristics.
- 4.2 The standards or regulations for format and content of the specifications have to be defined in the Project Manual.
- 4.3 After successfully completing the review of software requirements, the software requirement specifications must be officially approved by the pertinent departments and be subjected to configuration management. The appropriate phase review in the Project Manual has to be scheduled, with the participation of the customer.
- 4.4 Each requirement must be defined in such a way that its being met can be objectively verified with the help of a specified method.
- 4.5 The standards or regulations for form and content of the specification have to be defined in the QA Plan.
5. SW Development Process
All constructive and analytical quality measures must be tested, tried and qualified. (This requirement is met by using the method allocations).
6. Organization
The organizational units or persons in charge of the review have to be given sufficient resources, responsibilities, and authorizations.
7. Off-the-Shelf Products
- 7.1 The documentation of off-the-shelf products must meet the requirements of the contract and the AQAP-150.
- 7.2 If already existing software is modified within the scope of the development process it must be handled as development software.
8. Handling and Storing of Data Media
- 8.1 The contractor must use a security system that allows software access only via an authorization process and allows access only to persons that need to have access to the data.
- 8.2 The contractor must guarantee that the software can be read and that this readability is maintained.
- 8.3 The contractor must guarantee that software and baseline software (reference configurations) are saved separately and can be accessed easily.
- 8.4 The contractor must guarantee that release and delivery of software are sufficiently documented and that release and delivery will be checked and controlled.
- 8.5 The contractor must guarantee that the reproduction process for the generation of several customized software versions is controlled and supervised.
9. Software Technology
- 9.1 The contractor has to standardize all notations (even the graphical ones).
- 9.2 The development must be supported so all software quality characteristics can be traced across all design and implementation levels.
10. Measures with Regard to Subcontractors
The contractor must use procedures for the selection of subcontractors and introduce process regulations in order to set up interfaces to the subcontractors.
11. Access and Participation of Customers
The contractor must allow the customer access to his own installations or respectively to his subcontractor's installations. The contractor must provide customers with every needed support-according to contract-during the evaluation of the software quality management program and the review of the SW products.
12. Evaluation and Verification
With regard to the software product stipulated by contract, quantitative/qualitative evaluation criteria must also be applied for the management and control of the development process. The evaluation criteria have to make it possible to specify the current performance level, the introduction of remedial measures, and the definition of objectives for improvement.
If the customer demands a QA system according to AQAP, the contractor can prove this by submitting a "formal acknowledgement" from BWB-AT. This document implies the existence of an ISO certificate.