![]() |
![]() |
![]() |
|
![]() |
|||
![]() |
SC.1 Overview
The following scenarios are illustrated:
The scenarios were generated on the basis of actual project experience from V-Model projects in the BWB and in industrial corporations. The contents are compatible with international concepts (ISO, WEAG), and the concepts of the corresponding American Standards (MIL-STD-498 etc.).
SC.2 Incremental Development
SC.3 Grand Design (Traditional Procedure)
SC.4 Use of Off-the-Shelf Products
SC.5 Object-Oriented Development
SC.6 Development of Knowledge-Based Systems
SC.7 Maintenance and Modification
![]() |
![]() |
This page online GDPA Online Last Updated 03.Mar.2004 by C. Freericks |