![]() |
![]() |
![]() |
|
Publications- P |
A-B-C- D-E-F- G-H-I- J-K-L- M-N-O- P-Q-R- S-T-U- V-W-X- Y-Z
Id. | Title |
---|---|
/Padberg, 1999/ | A Probabilistic Model for Software projects |
/Page-Jones, 1988/ | The Practical Guide to Structured System Design |
/Panaroni, 1996/ | Report on Deploying Process Technology on an Industrial Space Software Project |
/Pantelopoulos, 2000/ | Practical Measurements for Reengineering - The Software Testing Process |
/Pantelopoulos, 2000a/ | Practical Measurements for Reengineering the Software Testing Proces |
/Parets_Llorca, 1999/ | Capturing, Negotiating, and Evolving System Requirements: Bridging WinWin and the UML |
/Paulk, 1993/ | Capability Maturity ModelSM for Software, Version 1.1 |
/Pavlopoulou, 1999/ | Residual Test Coverage Monitoring |
/PCMS, 1992/ | MAESTRO II 2.1 PCMS Benutzerhandbuch |
/Pedersen, 2000/ |
SPI and Outsourcing |
/Pederson, 2000/ | Systematic's experiences on running an ambitious SPI initiative |
/Penedo, 1989/ | Acquiring experiences with executable process models |
/Penedo, 1990/ | Experiences with SEE architectural support for the automation |
/Penedo, 1991/ | Making Process-Based Environments Viable |
/Penedo, 1994/ | Life-cycle (Sub) Process Scenario |
/Penix, 2000/ | Verification of Time Partitioning in the DEOS Scheduler Kernel |
/Pérez, 1995/ | Customising Software Process Models |
/PERF-GU, 1991/ | PERFORM Guides: Project Quality Audit, Version 1.0, Ref. GU03001 |
/PERF-RM, 1991a/ | PERFORM Reference Manuals: Project Management, Version 1.1, Ref. RM01001 |
/PERF-RM, 1991b/ | PERFORM Reference Manuals: Systems Integration, Version 1.1, Ref. RM02001 |
/PERF-RM, 1991c/ | PERFORM Reference Manuals: Technical Applications, Version 1.0, Ref. RM02002 |
/PERF-RM, 1991d/ | PERFORM Reference Manuals: Business Applications, Version 1.0, Ref. RM02003 |
/PERF-RM, 1991e/ | PERFORM Reference Manuals: Pre-Study, Version 1.0, Ref. RM02006 |
/PERF-STD, 1991a/ | PERFORM Standards: Project Monitoring and Reporting, Version 1.0, Ref. ST01002 |
/PERF-STD, 1991b/ | PERFORM Standards: Company Quality System Audit, Version 1.0, Ref. ST03002 |
/PERF-STD, 1991c/ | PERFORM Standards: Project Quality Plan, Version 1.0, Ref. ST03003 |
/PERF-STD, 1991d/ | PERFORM Standards: Project Audit, Version 1.0, Ref. ST03004 |
/PERF-STD, 1991e/ | PERFORM Standards: Company Quality Manual, Version 1.0, Ref. ST03005 |
/Perfect 1996/ | A Platform for supporting the PERFECT methodology |
/Perry, 1985/ | Tools for evolving software |
/Perry, 1986/ | The iteration mechanism in the inscape environment |
/Perry, 1988/ | Problems of scale and process models |
/Perry, 1990/ | Policy and product-directed process instantiation |
/Perry, 1991/ | Policy-directed coordination and cooperation |
/Perry, 1991a/ | The ISPW7-Example Solution |
/Perry, 1994a/ | Issues in process architecture |
/Perry, 1994b/ | Enactment Control in Interact/Intermediate |
/Perry, 1996/ | Evaluating Workflow and Process Automation in Wide-Area Software Development |
/Perry, 1999/ | Collaboration Support in Multi-Site Software Development |
/Perry, 2000/ | Empirical Studies of Software Engineering: A Roadmap |
/Peters, 1988/ | Advanced Structured Analysis and Design |
/Peuschel, 1990/ | A flexible environment architecture as a basis for distributed software development |
/Peuschel, 1990a/ | ISPW--6 Exercise Solution |
/Peuschel, 1991/ | A Consistency Model for Team Cooperation |
/Peuschel, 1991a/ | ISPW--7 Exercise Solution |
/Peuschel, 1992/ | Concepts and Implementation of a Rule-Based Process Engine |
/Peuschel, 1993/ | Architectural Support for distributed process centered software development environments |
/Pfahl, 2000/ | Using Simulation to Visualise and Analyse Product-Process Dependencies in Software Development Projects |
/Pfeifer, 1995/ | EUROMETHOD: Inhalte, Status und Ausblick |
/Phalp, 1994/ | A Pragmatic Approach to Process Modelling |
/Phalp, 2000/ | The Application of Metrics to Industrial Prototyping Processes: An Empirical Study |
/PHB, 1991/ | Prozeßhandbuch für die Erstellung von Anwendersoftware und Realisierung von Projekten |
/Phillips, 1988/ | State change architecture: a protocol for executable process models |
/Picco, 2000/ | Developing Mobile Computing Applications with LIME |
/Picco, 1999/ | LIME: Linda Meets Mobility |
/Pickerill, 1999/ | What is this 'thing' called management commitment? |
/Pietsch, 1995/ | Konversion von Vorgehensmodellen |
/Pietsch, 1997/ | Effektives werkzeuggestütztes Prozessmanagement |
/Pisan, 2000/ | Extending Requirement Specifications Using Analogy |
/Pitterman, 2000/ |
Telcordia Technologies:The Journey to High Maturity |
/Plekhanova, 1998/ | On Project Management Scheduling where Human Resource is a Critical Variable |
/Pletat, 1984/ | Theory and concepts for a software engineering environment |
/Plihon, 1998/ | A Reuse-Oriented Approach for the Construction of Scenario Based Methods |
/Podnar, 2000/ | SDL Based Approach to Software Process Modelling |
/Podorizhny, 1997/ | The Criticality of Modeling Formalisms in Software Design Method Comparison: Experience Report |
/Poerwantoro, 2000/ | Multibook's Test Environment |
/Ploenzke, 1991/ | ISOTEC-Version 2.2 |
/Pohl, 1994/ | Decision oriented process modelling |
/Polo, 1999/ | Using The ISO/IEC 12207 Tailoring Process For Defining a Maintenance Process |
/Ponhoefer, 1997/ | Migration eines Projektes vom BVB-Phasenmodell zum V-Modell |
/Pooley, 2000/ | Software Engineering for Performance: A Roadmap |
/Potts, 1989/ | A Generic Model for Representing Design Methods |
/Potts, 1984a/ | Proceedings of the Software Process Workshop |
/Pressmann, 1996/ | Software Process Impediment |
/Pressmann, 1998/ | Can Internet-Based Applications be Engineered? |
/Prince, 1999/ | The Design of an Interactive Online Help Desk in the Alexandria Digital Library |
/Prowell, 1999/ | Cleanroom Software Engineering: Technology and Process |
/Pulford, 1995/ | Quantitative Apporach to Software Management |
/Purper, 1998/ | A Graphical Development Process Assistant |
/Purper, 1999a/ | Mapping IEEE 1220 and V-Model |
/Purper, 1999b/ | GDPA: A Process Web-Center |
/Purper, 1999c/ | An environment to support flexibility in process standards |
/Purper, 1999d/ | Process Web-Centre as a learning environment for software process standards |
/Purper, 1999e/ | GDPA: a Learning Environment for Software Process Standards |
/Purper, 2000/ | Transcribing Process Model Standards into Meta-Processes |
/Purper, 2000b/ | GDPA: A Process Web-Centre for the V-Model |
/Purper, 2000c/ | Web-Center for Software Process Technologies |
/Putnam, 1980/ | Software Cost Estimating and Life-Cycle-Control (Tutorial) |
Get gsview2 to read PS files
Get Acrobat to read PDF files
Get WinZip to read ZIP files
This page online GDPA Online Last Updated 16.Jun.2006 by C. Freericks |