| RE 8.4: Renewed Putting into Operation |
Contents
|
|
|---|
Product Flow
| From | Product | to | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Activity | State | Chapter | Title | Activity | State | ||||||||||||
| RE7.3 | accepted | All | Operational Information: User Manual Diagnosis Manual Operator Manual Other Application Information |
- | -
| RE8.3 |
accepted |
All |
System (installed)- |
-
| - |
- |
All |
System (installable and in operation)External (1) |
submitted
| | ||
Handling
In order to support the renewed initial operation, the following measures have to be taken:
For a certain period of time, it might be necessary that the old operating procedures are used to guarantee a smooth operation, or the old System must be used in parallel to the new System.
The old System must be removed (e. g. termination of licenses, deletion of data volumes, recycling old hardware systems) according to the legal requirements.
![]() |
![]() |